Monash Medical Centre
Product Images
Project Overview
An integrated heating system was required for Monash Medical Centre, which required a site visit before recommendations could be made.
After offering advice and recommendations to the consultant, Automatic Heating completed a specification designed to produce significant energy savings. This offered a payback period of less than two years from the supply of equipment.