Many building owners want to electrify their heating, but the cost, space, and electrical supply required for a full heat pump plant can stop the project from going ahead.
A hybrid heating system is a practical alternative. It pairs a right-sized electric heat pump with gas boilers or water heaters, so an existing building can electrify most of its heating without the full cost, space and power demands of going 100% electric.
If you need a new heating and hot water system for an existing building, a hybrid system might just be the right fit.
How a hybrid heating system works
A hybrid heating system combines electric heat pumps with gas boilers or water heaters. It’s a bit like a hybrid car, but for a building’s heating plant.
- Heat pumps handle the everyday load.
- Gas boilers or water heaters switch on when the heat pumps can’t reach their setpoint on their own, usually during peak load periods.
- A controller stages the equipment and connects to the building’s existing BMS.
Heating systems are designed to handle the coldest day of the year, but they spend most of their life at part load. A building sized for 100 kW might need only around 20 kW for most of the year.
As a result, heat pumps sized at 20 to 30% of peak capacity can cover up to 65 to 70% of a building’s annual heating operations. For retrofits, that can mean lower running costs for a fraction of the up-front cost of full electrification, with a clear path to full electrification later.
4 reasons hybrid systems work for existing buildings
- Lower up-front cost. Heat pumps cost much more than gas boilers. Replacing an entire gas system with heat pumps can be costly, and many clients can’t fund it in one go. A hybrid system only needs heat pumps for 20 to 30% of the building’s peak capacity, so it costs much less to install.
- Uses the existing gas boilers. If the existing boilers still have useful life left, they can stay in place to cover peak demand. Adding heat pumps improves efficiency and reduces gas use. More heat pumps can be added to electrify over time, reducing emissions and spreading the cost across several years.
- Less roof space. Heat pumps are much larger than boilers and need open, well-ventilated space, usually on the roof. Many buildings don’t have enough of this space. Weight limits, lifts and crane access also restrict what can be installed. A hybrid system needs fewer heat pumps, so it takes up less room.
- Less power. A full heat pump system draws a large amount of electricity. That power often isn’t available at the roof, and sometimes not even at the site from the street. Upgrading the supply is expensive and slow. A hybrid system draws less power, so it can often run on the existing supply.
Hybrid heating system costs and payback
We modelled a 500 kW heating plant to compare options over 15 years.
| Option (modelled 500 kW plant) | Up-front cost | Running cost per year | Emissions per year (tCO2-e) | 15-year total cost |
|---|---|---|---|---|
| New gas condensing boilers only | $135,000 | $64,900 | 100 | $829,000 |
| 20% heat pump hybrid | $280,000 | $45,300 | 44 | $759,000 (lowest modelled) |
| 100% heat pump | $800,000 | $38,900 | 11 | $1,206,000 |
Note: these figures are a projection based on a modelled 500 kW heating plant. They are not a guaranteed quote. Actual costs will vary with each building’s location, heating load, existing plant and energy prices.
Most heating plants last around 15 years. In this model, the hybrid pays for itself in about 7 years, well within that time.
Hybrid heating as a first step to full electrification
A hybrid system can be the first step towards 100% electrification. You start with heat pumps covering 20 to 30% of the building’s peak capacity, then add more as budget and power supply allow. Each stage moves more of the heating from gas to electric, until the gas units are no longer needed.
This staged approach suits buildings working towards net zero targets. Australia’s Net Zero Plan sets a national goal of net zero emissions by 2050, with a 62 to 70% cut below 2005 levels by 2035. A hybrid system lets a building start reducing its gas use now, while it works towards full electrification.
The savings from each stage can help pay for the next. This spreads the cost of electrification over several years, which is often easier to fund than one large project, especially if the work is financed.
Dock 5 Apartments: a hybrid heating retrofit in Docklands
Dock 5 is a 30-floor tower on the Docklands waterfront. In 2025, we designed, supplied and commissioned a hybrid heating system to replace the building’s gas boilers.
- 6 x Revere CHE-015 R290 heat pumps, which provide up to 90% of the operation demand and heat water to 75°C
- 2 x Meridian City 90 kW condensing water heaters, which cover peak demand and act as backup
- A control box that switches the heat pumps on and off as needed
Because the heating is shared across eight units, the system keeps running while one unit is being serviced.
Plan a staged electrification for your building
We supply both parts of a hybrid system: Revere heat pumps and Meridian condensing water heaters.
Our in-house controller switches between them and connects to your building’s existing BMS. Our Technical Design Team works with your mechanical and hydraulic consultants on the design. After installation, our Service Department provides commissioning and can provide scheduled maintenance and 24/7 emergency repair and advice.
For more on upgrading your existing plant, read our Guide to Retrofit Commercial Heating and Hot Water Solutions.
To plan a staged approach for your site, get in touch with us today.